Free Engineering Workbench calculator

Strip ratio and powder factor

Track waste moved per tonne of ore and explosive use per tonne blasted.

Open Strip ratio and powder factor in the live, interactive calculator — type your numbers, see the result instantly.

Open live calculator →
Operations & supply chain
Mining

How it's worked out

  • Strip ratio = waste ÷ ore. Powder factor = explosives ÷ rock blasted
  • Same period
NoteA rising strip ratio raises cost per tonne of ore even when unit mining cost is flat.

Source: Mining engineering practice (SME Mining Engineering Handbook)

Need help acting on this number?

VVnT SeQuor's Core IT & Managed Services practice helps teams turn this metric into a plan.

Talk to us →

Related calculators