Free Engineering Workbench calculator

Line rate (JPH) and line efficiency

Track jobs per hour against the takt the line is designed for.

Open Line rate (JPH) and line efficiency in the live, interactive calculator — type your numbers, see the result instantly.

Open live calculator →
Operations & supply chain
AutomotiveManufacturing & IoT

How it's worked out

  • Planned = available seconds ÷ takt. Efficiency = produced ÷ planned. JPH = produced ÷ hours
  • One shift or day
NoteLine efficiency below 90% usually traces to a few stations; pair it with a stop-reason Pareto.

Source: Automotive assembly practice (JPH, line efficiency)